Report 08/2026: Collision between two passenger trains near Talerddig - GOV.UK
">
Cookies on GOV.UK
We use some essential cookies to make this website work.<br>We’d like to set additional cookies to understand how you use GOV.UK, remember your settings and improve government services.<br>We also use cookies set by other sites to help us deliver content from their services.
You have accepted additional cookies. You can change your cookie settings at any time.
You have rejected additional cookies. You can change your cookie settings at any time.
Accept additional cookies
Reject additional cookies
View cookies
Hide cookie message
Skip to main content
Report 08/2026: Collision between two passenger trains near Talerddig
Collision between two passenger trains near Talerddig, Powys, 21 October 2024.
From:
Rail Accident Investigation Branch
Published:<br>18 June 2026
Railway type:
Heavy rail
Report type:
Investigation report
Date of occurrence:
21 October 2024
R082026_260618_Talerddig
Summary
At around 19:26 on Monday 21 October 2024, train reporting number 1J25, the 18:31 service from Shrewsbury to Aberystwyth, collided with train 1S71, the 19:09 Machynlleth to Shrewsbury service. The collision took place near Talerddig, Powys. Both train services were operated by Transport for Wales Rail Limited (TfWRL).
The trains were operating on Network Rail’s Cambrian lines. This is predominantly single track, with passing loops provided at intervals to allow trains travelling in opposite directions to pass each other. Train 1J25 had been approaching the loop at Talerddig, with an intended stopping position within the loop, so that train 1S71 could pass it. However, train 1J25 did not stop as intended, continuing through the passing loop and into the single line section on which train 1S71 was approaching.
The head-on collision occurred while train 1J25 was travelling at approximately 39 km/h (24 mph) and train 1S71 was travelling at approximately 11 km/h (6 mph) in the opposite direction. At the point where the collision occurred, train 1J25 had travelled around 1,080 metres beyond its intended stopping position.
A passenger travelling on train 1J25 suffered fatal injuries as a consequence of the collision. Three people on this train were also seriously injured, including the train’s guard, and 18 other people received minor injuries. The driver of train 1S71 suffered serious injuries, and the remaining five people on this train all suffered minor injuries.
Neither train derailed, but extensive damage was caused to both trains. Damage was also caused to railway infrastructure in Talerddig loop. The railway remained closed until 28 October 2024.
RAIB’s investigation found that the accident was caused by train 1J25 passing its authorised stopping position and entering the single line beyond, which was occupied by the approaching train 1S71.
Train 1J25 passed its authorised stopping position due to a combination of three factors. These were that the wheel-rail adhesion in the area approaching the Talerddig loop was low, although not exceptionally so for this area during October. In addition, the two sanding systems fitted to train 1J25 which could have mitigated the prevailing low adhesion conditions, and avoided the accident, did not dispense sand. The automatic sander did not function, probably due to the presence of electrical faults in its control circuit, while the manually operated emergency sander was not activated by the driver. The third factor was that the approach speed of train 1J25 towards the eastern entry to Talerddig loop was such that the deceleration required to slow the train for the loop could not be sustained with the available wheel-rail adhesion.
Having passed its intended stopping position within Talerddig loop, train 1J25 entered the single line beyond. This area had exceptionally low wheel-rail adhesion and was on a steep downhill gradient. This meant that, even though the brakes on train 1J25 remained applied, the train did not decelerate as it approached train 1S71. There were no engineered mitigations to prevent train 1J25 entering the occupied single line in the event of an overrun.
Behind this lay a number of underlying factors and factors affecting the consequences of the accident. These involve a range of issues and organisations.
Recommendations
As a result of the investigation, RAIB has made nine recommendations:
Two recommendations are made to the Rail Safety and Standards Board and Angel Trains to improve the design, maintenance and testing of trainborne sanding equipment.
A recommendation is made to Network Rail to review the assumptions made to justify the use of simple assessments of overrun risk on the Cambrian lines, considering the circumstances of this accident, and updated industry standards.
A recommendation is made to Network Rail to improve overrun protection in future versions of software-based train control systems and for it to review how overrun...